Analysis of Value-Added Activities and Non-Value-Added Activities in the Production Process of Car Body Stands Using the Manufacturing Cycle Effectiveness (MCE) Method
DOI:
https://doi.org/10.63643/jges.v3i2.334Kata Kunci:
Value Added Activities, Non Value Added Activities, Cycle Time, MCEAbstrak
PT. XXX is a manufacturing fabrication company whose production process still involves non-value-added activities, resulting in a mismatch between planned and actual timelines, including a three-day delay in the production of the Car Body Stand. This study aims to identify value-added and non-value-added activities, calculate cycle time, and analyze Manufacturing Cycle Effectiveness (MCE) by comparing predicted and actual timelines, as well as to propose improvements to enhance production performance. The findings show that total value-added activities reach 480.5 hours, while non-value-added activities account for 41 hours. The predicted cycle time is 467 hours, whereas the actual cycle time extends to 551.5 hours. The MCE is 88.9% under predicted conditions and 85.8% in actual conditions. After implementing the proposed improvements, non-value-added activities decrease to 27 hours, and the cycle time improves to 523.5 hours, leading to an increased MCE of 90.4%. Overall, these results suggest that reducing non-value-added activities can effectively improve production efficiency and reduce delays.
Referensi
Bashori, M. I. (2023). Analisis Waste Pada Proses Produksi Decking dengan Pendekatan Lean Manufacturing di PT. Cahaya Niaga Persada. G-Tech: Jurnal Teknologi Terapan, 1643-1652.
Farhan Akmala Putra, S. P. (2025). Manajemen Produksi. Penamuda Media.
Hantono, S. E. (2025). Pengantar manajemen. Penerbit Widina.
Ilham, M. (2024). Evaluasi Aktivitas Non Value Added Dengan Menggunakan Metode Value Stream Mapping Dan Process Activity Mapping. https://jurnal. untag-sby. ac. id/index. php/HEURISTIC.
Maulina, R. D. (2024). Analisis Non Value Added Activity Melalui Penerapan Activity Based Management untuk Meningkatkan Efisiensi pada Cafe Barista di Kota Bangkalan. Jurnal Media Akademik (JMA).
Ningsih, S. R. (2024). Pengaruh Teknologi Terhadap Produktivitas Tenaga Kerja di Indonesia. Journal of Bussiness, Economics, and Finance, 1-9.
Nurdiansyah, D. F. (2022). Usulan efisiensi waste proses produksi bed sheet di pt. abc menggunakan metode value stream mapping. Jurnal Bayesian: Jurnal Ilmiah Statistika dan Ekonometrika, 93-106.
Pangestu, A. D. (2024). Peran quality control terhadap efektivitas proses produksi. Business Management and Entrepreneurship Journal, 47-62.
Putri, N. A. (2025). Analisis Efisiensi Proses Produksi dalam Meningkatkan Produktivitas Perusahaan Manufaktur. Jurnal Sains Dan Teknologi| E-ISSN: 3063-9980, 97-102.
Rahmadani, D. W. (2024). Efisiensi Melalui Analisis Non Value Added Berbasis Activity-Based Management: Studi pada Bento Kopi Cirebon. Journal of Sharia Accounting and Tax, 321-337.
Rosikin, R. R. (2024). Analisis lean manufacturing untuk menurunkan cycle time proses assembly menggunakan metode PDCA di PT X. Innovative: Journal of Social Science Research, 17103-17119.
Sudiantoro, R. A. (2025). Waste Assessment Model untuk Peningkatan Produktivitas dalam Bisnis Jasa Bengkel. Jurnal Teknologi dan Manajemen Industri Terapan, 930-940.
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
Hak Cipta (c) 2026 Lita Silvianti Rosyadi

Artikel ini berlisensiCreative Commons Attribution-ShareAlike 4.0 International License.










